|
|
Nebraska Comprehensive Nutrient Management Plan (CNMP)III. Engineering
Design Calculations (includes manure volume and runoff volume calculations used to size components)Precipitation/Runoff Data (form NE-ENG-81)
Manure and Runoff Production Volumes
Construction Quality Assurance Plan (including liner post-testing requirements) Liner Plan Soil Mechanics (Pre-Construction Testing)
Monitoring wells (NDEQ
may require these depending on the site, NRCS does not provide technical
assistance on installation) Last Updated 11/01/2007 |
|